Open with the business problem, not a list of screens. What kind of user will use this, how often, and how is the job done today? An experienced team who grasps the purpose often proposes a simpler way to reach it; one who only sees a list of screens will price the list as written.
Define what is included as concrete flows: who does what, and what happens next. Every bit as useful, marketplace development company list what is out of scope. A written out-of-scope list removes more disagreement later than almost anything else in the document. Indicate as well which items are decided and which are still open — honest teams price those differently, and concealing the open questions helps nobody.
Write down the hard constraints. These include the platforms and services involved, existing databases and their quality, compliance requirements, user volumes, target platforms and any technology you are committed to. If a deadline is real, say what depends on it: an experienced team is usually able to rearrange the plan to hit it, but only if they know it exists.
Write down what completion means for the important items. Testable acceptance criteria do not require special syntax: a short paragraph stating what a user should be able to do is sufficient. This single habit compresses acceptance testing considerably and closes off the most common source of disputes.
To close, ask for a specific format. Request a breakdown by feature or module, the assumptions behind each number, whatever the team considers risky and an optimistic and a pessimistic figure. Take a broad range as information, not evasion: it usually points to the part of the brief that needs work. At that point rewrite that part and crypto futures trading software development company request a revised number — the second estimate tends to be the one worth planning around.